In March 2023, Youngsville broke ground on its biggest road job at the corner of Youngsville Highway and Fortune Road. The city laid out the widening in two phases, according to BY Local News. Phase 1 runs from Fortune Road north to Ambassador Caffery Parkway. Phase 2 runs from "Fortune Road at Sabal Palms" south to Iberia Street and Highway 92. The same report noted a cost saver: dirt dug from the LaSalle Coulee and Bailey Grove regional ponds was hauled to the new Fortune Road extension and roundabout, cutting about a million dollars from their cost.
That split point is the useful fact for anyone comparing Youngsville neighborhoods this winter. Three and a half years later, the road work north and east of Sabal Palms is in its final stages. The work south of it is still being priced. Families looking at Sabal Palms, or at Sabal South, which its builder describes as sitting on Youngsville Highway, should expect a 2027 move to land them beside the finished half of the project and at the start of the unfinished half.
The Fortune Road Corner Is Already Rebuilt
The two-lane roundabout at Youngsville Highway and Fortune Road is open. The Advocate reported that the new traffic circle opened earlier in 2026. Getting it built took a closure. Starting October 13, 2025, the city shut the Fortune Road and Youngsville Highway intersection to tie the extended Fortune Road into the highway, and sent drivers around by Ambassador Caffery and Iberia Street.
That tie-in connects Sabal Palms to Broussard. The Broussard/Youngsville Connector, a joint project of the two cities, now links Youngsville Highway to West Fairfield Road in Broussard. In its announcement of the opening, the city called it "a faster, more direct route between the two growing cities." Youngsville's own detour advice shows how the road gets used. During an earlier highway closure, the city pointed drivers along the new connector to South Bernard Road and then to Ambassador Caffery. The Fortune Road extension reached its punch list in the summer of 2026. The mayor's road update in the November 12 City Council agenda packet says the city is waiting on state concurrence before formal close-out.
For a buyer, the corner that once had the most construction at the Sabal Palms entrance is now the finished piece. It also adds an east-west route that a two-lane Youngsville Highway never had.
North Toward Ambassador Caffery, the Work Is Finishing
Phase 1 is the stretch that sees the most traffic toward Lafayette. It began with a summer 2025 closure of Youngsville Highway from Heart D Farm Road to Fortune Road, planned for about 90 days and timed by the city to avoid school traffic. The goal is a highway four to five lanes wide. In September 2025, BY Local News reported that Mayor Ken Ritter had announced two lanes of the closed section were open again while crews kept building the extra lanes next to live traffic. The next segments would run from Heart D Farm to Ambassador, then from Fortune to Griffin.
The November packet describes Phase 1 as being in its utility and paving stage. Crews were boring and installing conduit for streetlights, with that work expected to wrap up in about three months, and asphalt binder was set to go down on the east lane. That puts the lighting work on track to finish around February 2027, close to the start of the spring buying season.
The sidewalks along this road come later. In February 2026, Youngsville announced a $459,737 federal award for LA 89 sidewalks from NuNus to Hawk Drive. As of November, that sidewalk project was still in early design review, on its Stage 0 checklist.
South Toward Highway 92, the Work Hasn't Started
Phase 2 starts at Sabal Palms. The Advocate reported that Ritter announced its start on July 1. The plan is four lanes from the Fortune Road roundabout south to the roundabout at Highway 92. In November, the city reported that Phase 2 had a contractor's guaranteed maximum price on 30 percent plans and was waiting on a price for 60 percent plans. Phase 1 needed lane closures, detours and more than a year of lanes opening one at a time. A buyer moving in 2027 should expect that same kind of work to come next, starting at the Sabal Palms end of the corridor and heading south.
The Highway 92 end has smaller jobs at different stages. South Larriviere Road, from Highway 92 at Young Street to Chemin Metairie Parkway, is being widened and raised, with ditches replaced by curb-and-gutter drainage and new sidewalks. Youngsville and the Acadiana Planning Commission broke ground on it in June 2025. The city accepted it as partially complete and open for use on November 3, 2026, with box culvert work left and completion expected by the end of the year. The Highway 92 left-turn lanes are on punch-list items. A planned roundabout at Highway 92 and Prescott has finished plans and is on its Stage 0 checklist. The Advocate reported that a roundabout at Larriviere Road and Young Street was scheduled to begin construction this year. Youngsville is paying 75 percent of it and Broussard 25 percent, matching how much of the intersection lies in each city.
The biggest item on this side belongs to the state. A resolution on the city's November 12 agenda calls the roundabout at LA 92 and LA 339, Verot School Road, "the single most significant outstanding transportation improvement affecting the City of Youngsville." It says the project is still conceptual, with no development schedule and no construction money. Because it is a DOTD intersection, the city cannot move it forward alone, so the resolution asks the state to prioritize the roundabout and fund it ahead of further widening on Verot School Road. Sabal Palms is near the south end of Youngsville Highway, so that intersection is on any trip west toward Verot School Road. The city's own documents give no date for when it will improve.
What Lafayette Parish Votes On December 12
The third group of projects is a ballot item. Lafayette Consolidated Government's Commuter Connections proposal asks parish voters on Saturday, December 12, 2026 to renew an existing bond millage. LCG says the renewal is "not a new tax." Early voting runs November 28 through December 5, and the online registration deadline is November 21. The Current reported the package as a bond of about $77 million for 18 projects. It would be repaid by continuing the property tax millage that now pays off a 2010 road bond, which brings in about $5.2 million a year.
Several of the listed projects are a few minutes from Sabal Palms:
- A roundabout replacing the all-way stop at Chemin Metairie Parkway and Fortune Road.
- Northbound and southbound right-turn lanes on Bonin Road at Ambassador Caffery Parkway.
- A roundabout replacing the all-way stop at Bonin Road and La Neuville Road.
- Left-turn lanes on Verot School Road from Woodstone Drive to Highway 92, plus turn-lane work at Vincent Road and Pinhook Road.
- Widening LA 89 from Albertson Parkway to Pinhook Road from two lanes to three.
LCG says the bond alone won't pay for the list. It plans to combine bond revenue with state capital outlay, local matches, state money and federal grants. The Current reported that new projects could take four to seven years to show real movement. If the renewal passes, a family moving to Sabal Palms in 2027 should count the Chemin Metairie and Fortune Road roundabout as a longer-range plan, not part of their first year in the house.
Reading Sabal Palms Against Other Youngsville Options
Put the three groups together and Sabal Palms is in an unusual spot. Its main corner is rebuilt. Its route north to Ambassador Caffery is in the lighting and paving stage. Its route east to Broussard opened as a new road. Over the next few years, the construction moves to the side of the neighborhood that faces Highway 92, Larriviere and Verot School Road.
That changes how to test-drive the area. A tour of Sabal Palms or Sabal South should include both directions on Youngsville Highway. The drive north shows what the finished road will be like. The drive south covers the stretch Phase 2 will rebuild. If daily trips run west toward Verot School Road, the Highway 92 roundabout belongs on that drive too. If they run through Bonin Road and Chemin Metairie, the drive covers the Chemin Metairie corridor we looked at this fall, including the all-way stop at Fortune Road that is on the parish's list.
Construction timing matters if you're building. A spring 2027 contract on a Youngsville lot means a build schedule that runs at the same time as Phase 2 pricing and possibly its first closures. Phase 1 showed what that looks like: the city closes a segment, posts detours, and reopens lanes in stages. Both the Sabal Palms and Sabal South neighborhood page and the broader Youngsville overview are good places to start that comparison.
If you're comparing Sabal Palms, Sabal South and the rest of Youngsville for a 2027 move, I'll drive both halves of Youngsville Highway with you and help you time a build or purchase around Phase 2. Reach out to Jessica Broussard and let's plan it. Build With Me.